This is just a reminder that we have a scheduled Network Maintenance for every building which has a Switch cupboard which affects all Wi-Fi and Wired connections within the building. The work begins on the 8th January and completing on January 10th 2025.

The network will be down in each building for up to 30 minutes per Switch cupboard, where some of the more used buildings have multiple switch cupboards in them. For these 3 days, we consider the college network to be at risk, so please schedule accordingly if you need to work from home during this time. The schedule is as follows which can be subject to change if the work is completed quicker than expected.

Wednesday

  • Darbishire – COMPLETED
  • House – COMPLETED
  • Hostel/Bursary – COMPLETED
  • Maitland – COMPLETED
  • ROQ West – COMPLETED
  • Dining Hall – COMPLETED

Thursday

  • ROQ East – COMPLETED
  • Margery Fry House – COMPLETED
  • Library/Holtby – COMPLETED
  • MTC/DHQ – COMPLETED
  • Vaughan – COMPLETED
  • Lodge – COMPLETED
  • Barbara Craig House – COMPLETED
  • Catherine Hughes Building – COMPLETED

Friday

  • Park – COMPELTED
  • Nursery (119a Walton Street) – COMPLETED
  • 155 Woodstock Road – IN PROGRESS
  • Penrose – COMPLETED
  • Wolfson – COMPLETED

If anyone has any issues with the schedule please email us at ict.desk@some.ox.ac.uk or give us a call at 01865 270597